![](http://tmrroofing.tmrroofing.com/wp-content/uploads/2016/01/Frederick-Douglas-Elementary-School-2-scaled.jpg)
The existing multi-layer built-up roofy system was removed and replaced with a new modified bitumen roof system with tapered insulation. The job was completed with a flood coated with gravel.
PROJECT DETAILS:
- Operating Unit:Tecta America East Fruitland
- Client: Seaford School District
- Project Type: Roof Replacement
- Location: Roof Replacement
- Square Footage: 54,800
- Systems Installed: Modified Bitumen
CONTACT INFO:
![](/wp-content/uploads/2023/08/8.png)
![](/wp-content/uploads/2023/08/9.png)
![](/wp-content/uploads/2023/08/12.png)
![](/wp-content/uploads/2023/08/Email-Icon.png)